Image display device and production method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9885895
SERIAL NO

14859678

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An image display device, and a production method thereof are provided, which maximize suppression of warping of a protective panel. A liquid crystal display panel and a transparent protective panel formed from a plastic are arranged facing each other via a cured resin. An outer dimension of the protective panel is made larger than an outer dimension of the display panel. Curing is carried out with an edge of the protective panel fixed with a fixing jig during and after curing. Alternatively, the outer dimension of the protective panel is substantially equal to an outer dimension of the display panel, which is substantially equal to an inner dimension of a case and the protective panel. Curing is carried out with the resin composition in contact with substantially the whole face of the protective panel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEXERIALS CORPORATION1724 SHIMOTSUBOYAMA SHIMOTSUKE-SHI TOCHIGI 323-0194

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamata, Yusuke Tochigi, JP 42 471
Shinya, Yoshihisa Tochigi, JP 62 551
Toyoda, Tomoyuki Tochigi, JP 31 181

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00