Imaging lens

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9885854
SERIAL NO

15430644

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An imaging lens includes a first lens group and a second lens group, arranged in this order from an object side to an image plane side. The first lens group includes a first lens having positive refractive power, a second lens having positive refractive power and at least one aspheric surface, and a third lens having two aspheric surfaces, arranged with a space in between. The second lens group includes a fourth lens having two aspheric surfaces, a fifth lens having negative refractive power and two aspheric surfaces, and a sixth lens having two aspheric surfaces, arranged with a space in between. The third lens is arranged away from the fourth lens by a specific distance, and the fifth lens and the sixth lens have a specific composite focal length, so that specific conditional expressions are satisfied.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKYO VISIONARY OPTICS CO LTD7F MJ BLDG 1-7-4 MINATO CHUO-KU TOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukaya, Hisao Tochigi, JP 90 607
Hirano, Hitoshi Nagano, JP 264 2221
Kubota, Kenichi Nagano, JP 193 1554
Kubota, Yoji Nagano, JP 174 1387

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00