Load center monitor with optical waveguide sheet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9885755
SERIAL NO

15023705

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical waveguide sheet 50 is fastened to an inward facing access door 4 of the load center 2. When the door is closed, the optical waveguide sheet is positioned so that one portion is juxtaposed with the circuit breaker 10A in the load center, to enable the optical waveguide sheet to receive an optical signal 70A characterizing current in the circuit breaker. The optical waveguide sheet 50 is further positioned so that another portion is juxtaposed with an optical window 48 of an aggregator. The optical waveguide sheet is configured to internally reflect the optical signal 70A within its body and to conduct the internally reflected optical signal from the circuit breaker to the optical window of the aggregator. The aggregator may provide information characterizing current usage to an alarm, a measurement device, the smart grid, or a storage device for later use.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHNEIDER ELECTRIC USA INC201 WASHINGTON ST SUITE 2700 ONE BOSTON PLACE BOSTON MA 02108

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meehleder, Steve M Cedar Rapids, US 11 160
Sharp, Jeffrey O Murfreesboro, US 26 332

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00