Aft conditioner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9885525
SERIAL NO

14607634

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Heat transfer pipes 26b1 and 26b2 extend from the other end section 21B to one end section 21A in an intermediate row L2 and combine in the one end section 21A to be heat transfer pipes 26c1 and 26c2. The heat transfer pipes 26c1 and 26c2 are configured to extend back and force once between the one end section 21A and the other end section 21B in a upstream row L1. Heat transfer pipes 26b3 and 26b4 extend from the other end section 21B to the one end section 21A in the intermediate row L2 and combine in the one end section 21A to be heat transfer pipes 26c3 and 26c4. The heat transfer pipes 26c3 and 26c4 are configured to extend back and force once between the one end section 21A and the other end section 21B in the upstream row L1. The heat transfer pipe 26c2 extending from the other end section 21B to the one end section 21A and the heat transfer pipe 26c4 from the other end section 21B to the one end section 21A are arranged to be adjacent to each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI-JOHNSON CONTROLS AIR CONDITIONING INCTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tada, Shuuhei Tokyo, JP 10 36
Tsuboe, Hiroaki Tokyo, JP 14 129
Yokozeki, Atsuhiko Tokyo, JP 13 93

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00