Sequential combustion with dilution gas mixer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9885481
SERIAL NO

14445162

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention refers to a sequential combustor arrangement including a first burner, a first combustion chamber, a dilution burner for admixing a dilution gas and a second fuel via a dilution-gas-fuel-admixer to the first combustor combustion products. The dilution-gas-fuel-admixer has at least one streamlined body which is arranged in the dilution burner for introducing the at least one second fuel into the dilution burner through at least one fuel nozzle, and which has a streamlined cross-sectional profile and which extends with a longitudinal direction perpendicularly or at an inclination to a main flow direction prevailing in the dilution burner. The streamlined body includes a dilution gas opening for admixing dilution gas into the first combustor combustion products upstream of the at least one fuel nozzle. The disclosure further refers to a method for operating a gas turbine with such a sequential combustor arrangement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANSALDO ENERGIA SWITZERLAND AGROMERSTRASSE 36 BADEN 5401

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Duesing, Michael Rheinfelden, DE 4 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00