Spring for use in one-way clutch and one-way clutch

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9885393
SERIAL NO

14899749

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A spring (11b) for a one-way clutch is provided that can suppress skewing of rollers and can restrain to a low level the stress generated due to bending of elastic pressure sections (23b1, 23b2). The spring (11b) is formed by subjecting an elastic metal plate to a bending process and comprises: a base section (22b) comprising a flat base-plate section (25); and a pair of elastic pressure sections (23b1, 23b2) formed by bending to an acute angle the both ends in the length direction of the base-plate section (25) towards the one side in the thickness direction of the base-plate section (25); and a pair of elbow sections (24a) located on the portions connecting the elastic pressure sections (23b1, 23b2) and the base-plate section (25). In particular, the elastic pressure sections (23b1, 23b2) cross each other in the middle sections in the length direction thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NSK LTD6-3 OHSAKI 1-CHOME SHINAGAWA-KU TOKYO 141-8560

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mori, Hirofumi Kanagawa, JP 52 382

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00