Flexibly operable power plant and method for the operation thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9885257
SERIAL NO

14904057

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One embodiment relates to a power plant having a large steam generator, which is equipped with hydrocarbon-fired burners and/or with a gas turbine and which has a water/steam circuit connected thereto, and comprising at least one device for generating a CO2-rich gas flow, wherein the electrical power output of the electricity-generating part, of the power plant to the electrical grid is subject to power regulation controlled, at the power grid side. Some embodiments relate to a flexible operating method for the power plant that is fired with hydrocarbon-containing fuel, which operating method permits in particular a rapid adaptation of the power plant output to the power demands from the grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HITACHI POWER SYSTEMS EUROPE GMBHSCHIFFERSTR 80 DUISBURG 47069

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bergins, Christian Datteln, DE 10 46
Buddenberg, Torsten Moers, DE 6 53
Koytsoumpa, Efthymia-Ioanna Duisburg, DE 2 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00