contents and method of producing it

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9885109
SERIAL NO

14419692

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The embodiments of the invention cover a ceramic sputtering target comprising at least 85 wt. % of an (In4Sn3O12 phase, wherein the ceramic sputtering target has a density of greater than 7.0 g/cm3. A method of forming an ITO ceramic sputtering target is also described by combining 53 to 65 wt. % of In2O3 and 35 to 47 wt. % of SnO2 to form a first In2O3/SnO2 mixture; mixing and milling the In2O3/SnO2 mixture in the presence of water and a dispersing agent until a first slurry is formed, wherein the average particle size of the first slurry is between 0.3-0.7 μm and wherein the specific surface area is between 4-8.5 m2/g; drying the first slurry to form a powder; heat treating the powder at 1300 to 1500° C. to form a compound having an In4Sn3O12 phase; adding additional In2O3 and SnO2 to the compound having the In4Sn3O12 phase thereby forming an In—Sn—O-based mixture having an atomic In/Sn ratio of 1.33; forming the ITO ceramic sputtering target.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VITAL THIN FILM MATERIALS (GUANGDONG) CO LTDGUANGDONG PROVINCE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Medvedovski, Eugene Providence, US 4 11
Szepesi, Christopher West Warwick, US 1 5
Yankov, Olga Coventry, US 2 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00