Process for the production of an enzymatic cocktail using solid residues from a process for the biochemical coversion of lignocellulosic materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9885027
APP PUB NO 20140349373A1
SERIAL NO

14365274

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention concerns a process for the production of an enzymatic cocktail by submerged culture with a cellulolytic microorganism, comprising two phases:

    a phase a) for growth of said microorganism in the presence of at least one carbonaceous growth substrate in a closed reactor, said growth phase being carried out with a concentration of carbonaceous growth substrate in the range 10 to 90 g/L;a phase b) for the production of the enzymatic cocktail, in which at least one carbonaceous inducer substrate is supplied, said carbonaceous inducer substrate being at least one solid residue obtained from the step for enzymatic hydrolysis of lignocellulosic materials which have undergone a pre-treatment step, said production phase being carried out with a concentration of carbonaceous production substrate in the range 150 to 400 g/L.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IFP ENERGIES NOUVELLESFRANCE RUEZ - MA MAISON RUEIL-MALMAISON HAUTS-DE-SEINE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ben, Chaabane Fadhel Paris, FR 12 29
Louret, Sylvain Lyons, FR 19 126

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00