Comb copolymer and process for the preparation thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9884933
SERIAL NO

15338588

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A comb copolymer having a backbone of 2-acrylamido-2-methylpropanesulfonic acid, with grafted lateral side segments of poly(N-alkylacrylamide) or poly(N,N-dialkylacrylamide), is provided. A process for the preparation of the comb copolymer includes reacting a compound of formula (II) with a compound of formula (III) in a (tert-butanol)-water mixture, to obtain a poly(N-alkylacrylamide) or poly(N,N-dialkylacrylamide) telomere of formula (I); reacting in tert-butanol the telomer of formula (I) with an acid chloride of formula (IV) to obtain a solution of the macromonomer of formula (V); and copolymerizing in tert-butanol the macromonomer of formula (V) with an ammonium salt of 2-acrylamido-2-methylpropanesulfonic acid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOCIETE D'EXPLOITATION DE PRODUITS POUR LES INDUSTRIES CHIMIQUES SEPPIC75321 PARIS CEDEX 07

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Braun, Olivier St Just St Rambert, FR 73 310
Mallo, Paul Croissy-sur-Seine, FR 62 400

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00