Method of preparing 1,3-butadiene and methyl ethyl ketone from 2,3-butanediol using adiabatic reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9884800
SERIAL NO

15477618

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a method of preparing 1,3-butadiene and methyl ethyl ketone from 2,3-butanediol, including: a) providing a plurality of adiabatic reactors, which include a catalyst bed for dehydrating 2,3-butanediol, without a heat transfer medium, and are connected in series; b) introducing a stream including 2,3-butanediol at a temperature ranging from 200° C. to 400° C. into a first adiabatic reactor among the plurality of adiabatic reactors; c) dehydrating the 2,3-butanediol so as to be converted into 1,3-butadiene and methyl ethyl ketone and discharging a product stream including 1,3-butadiene and methyl ethyl ketone; d) heating the discharged product stream to to 200° C. to 400° C.; and e) introducing the heated product stream into a second adiabatic reactor so that 2,3-butanediol is further dehydrated and converted into 1,3-butadiene and methyl ethyl ketone and then discharging the product stream including 1,3-butadiene and methyl ethyl ketone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SK INNOVATION CO LTD(SEORIN-DONG) 26 JONG-RO JONGNO-GU SEOUL 03188

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Song, Dae Sung Daejeon, KR 5 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00