Multi-strip beam-forming apparatus, method, and beam

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9884597
SERIAL NO

15173797

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bumper reinforcement beam includes sheets pre-formed to have integral features and to have a final beam shape with non-radiused corners and optimal impact properties, including beams with constant or varied cross-sectional shapes, and beams made of steel, aluminum, or hybrid materials or combinations of material, all of which allow minimization of weight. The non-radiused corners offer excellent impact strength and properties. Beam impact properties can be improved or locally tuned for particular functional requirements by material selection, or by adding an internal reinforcement on an inside center of the front wall, or by localized annealing of the welds to minimize stress risers, or by localized features and shapes. The sheets can be welded using welding processes that provide low heat-affected-zones around the weld or by localized annealing, thus minimizing any adverse effect of welding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHAPE CORP1900 HAYES ST GRAND HAVEN MI 49417

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matecki, Joseph R Allendale, US 22 186
Pothoven, Jonathon J Coopersville, US 2 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00