Dunnage conversion machine and method with downstream feed monitor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9884465
SERIAL NO

13979749

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dunnage conversion machine provides an improved electronic monitoring and control system for detecting and resolving many jamming conditions before they require significant operator intervention. The machine includes a conversion assembly with a feeding device that feeds the sheet stock material through the machine, and a sensing device downstream of the feeding device to monitor movement of the stock material downstream of the feeding device and to output a corresponding signal. A controller controls operation of the feeding device in response to the signal from the sensing device. The controller uses the signal to detect a potential jam condition and controls the feeding device to prevent or minimize the occurrence or severity of the jam condition, thereby minimizing the amount and degree of required operator intervention.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RANPAK CORP7990 AUBURN ROAD CONCORD TOWNSHIP OH 44077

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sip, Jiri G Strongsville, US 4 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00