Immersion fixed bed reactor intensified by liquid flow

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9884304
SERIAL NO

14361572

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An immersion fixed bed reactor intensified by liquid flow contains a cylindrical tank internally installed with an annular cylindrical catalyst bed (ACCB) packed with solid catalysts is provided. The inner and outer walls of the ACCB are composed of two layers of stainless steel sheets with holes. The outer layer of stainless steel perforated with holes. The inner layer of catalyst contacting stainless steel is covered with stainless steel waved mesh in circumferential direction. The bottom of AACB is sealed with a steel plate by welding or a blind plate and the top of ACCB is fixed to cylindrical tank with a flange. The solid catalysts are packed in the ACCB.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANJING UNIVERSITY210023 163 XIANLIN ROAD QIXIA DISTRICT NANJING JIANGSU NANJING CITY JIANGSU PROVINCE 210023

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dai, Yue Nanjing, CN 7 2
Liu, Xiaojuan Jiangsu, CN 4 5
Wu, Pingkeng Nanjing, CN 2 1
Yang, Gaodong Nanjing, CN 18 11
Zhang, Zhibing Nanjing, CN 39 88
Zhou, Zheng Nanjing, CN 123 520

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00