Combined ophthalmic laser device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9883971
SERIAL NO

14439663

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The object of the invention is a laser device for eye surgery used by ophthalmologists in the treatment with capsulotomy and iriditomy, and a device for selective laser trabeculoplasty. The essence of the ophthalmic laser combined device of the invention lies in that it has one single laser with one optical axis for both wavelengths; the basic wavelength of 1064 nm and the frequency doubled wavelength of 532 nm. Switching between both wavelengths is carried out by a polarization orientation switch. Frequency doubling is inactive at the wavelength of 1064 nm and it is active for the wavelength of 532 nm. At the wavelength of 532 nm additional optical elements for attenuating and collimating the laser pulse are switched on.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OPTOTEK D O O4210 BRNIK - AERODORM

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dolzan, Ales Litija, SI 1 25
Kunstelj, Klemen Skofja Loka, SI 1 25
Vedlin, Boris Ljubljana, SI 3 42
Vrecko, Andrej Ljubljana, SI 4 39
Zalar, Matjaz Vi{hacek over (s)}nja Gora, SI 2 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00