Crop processing apparatus in a combine harvester

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9883631
SERIAL NO

14442042

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combine harvester comprises a threshing unit arranged to receive and thresh a crop stream. Separating apparatus are located downstream and rearward of the threshing unit and are arranged to receive the threshed crop stream and convey such a rearward direction. The front of a return pan, disposed below the separating apparatus, overlaps the rear of a stratification pan, disposed below the threshing unit. The stratification pan is driven in an oscillating manner to convey a primary grain/chaff stream rearwardly to a rear edge from where the primary grain/chaff stream falls under gravity into a cleaning unit. The return pan is driven in an oscillating manner to convey a secondary grain/chaff stream forwardly to a front edge from where the secondary grain/chaff stream falls under gravity to combine with the primary grain/chaff stream on the stratification pan. The cleaning unit comprises a fan for generating a cleaning airstream which is directed through the falling grain/chaff stream to encourage the lighter material away from the grain. A plurality of crop flow disrupting elements in the form of fins or tines are secured to the underside of the return pan above the stratification pan to disrupt the grain/chaff stream and enhance stratification thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AGCO A/S8900 RANDERS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bilde, Morten Leth Langaa, DK 37 116

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00