Substrate structures and methods of manufacture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9883595
SERIAL NO

15206574

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power electronic substrate includes a metallic baseplate having a first and second surface opposing each other. An electrically insulative layer also has first and second surfaces opposing each other, its first surface coupled to the second surface of the metallic baseplate. A plurality of metallic traces each include first and second surfaces opposing each other, their first surfaces coupled to the second surface of the electrically insulative layer. At least one of the metallic traces has a thickness measured along a direction perpendicular to the second surface of the metallic baseplate that is greater than a thickness of another one of the metallic traces also measured along a direction perpendicular to the second surface of the metallic baseplate. In implementations the electrically insulative layer is an epoxy or a ceramic material. In implementations the metallic traces are copper and are plated with a nickel layer at their second surfaces.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR COMPONENTS INDUSTRIES LLC5005 E MCDOWELL ROAD MAILDROP A700 PHOENIX AS 85008

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Yusheng Phoenix, US 113 146
Takakusaki, Sadamichi Ota, JP 29 243

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00