Microelectronic system including printed circuit board having improved power/ground ball pad array

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9883591
SERIAL NO

15431781

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A microelectronic system includes a printed circuit board and a semiconductor package mounted on the printed circuit board. The printed circuit board includes a laminated core having an internal conductive layer and a build-up layer. The build-up layer includes a top conductive layer. Microvias are disposed in the build-up layer to connect the top conductive layer with the internal conductive layer. A power/ground ball pad array is disposed in the top conductive layer. The power/ground ball pad array includes power ball pads and ground ball pads arranged in an array with a fixed ball pad pitch P. The power/ground ball pad array includes a 4-ball pad unit area comprised of only one ground ball pad and three power ball pads, or comprised of only one power ball pad and three ground ball pads. The 4-ball pad unit area has a rectangular shape and a dimension of about 2P×2P.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEDIATEK INCNO 1 DUSING RD 1ST SCIENCE-BASED INDUSTRIAL PARK HSIN-CHU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Sheng-Ming New Taipei, TW 27 237
Chen, Chun-Ping New Taipei, TW 13 99
Lin, Shih-Chieh Taipei, TW 79 385
Liu, Chia-Hui Taichung, TW 5 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00