Package structure and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9883579
SERIAL NO

15353726

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A package structure includes a circuit substrate, first and second build-up circuit structures, and a plurality of piezoelectric heat dissipation units. The circuit substrate includes a core layer, a plurality of electronic devices, and a conducting unit. The electronic devices are embedded in the core layer, and active surfaces of the two adjacent electronic devices respectively face a first surface and a second surface of the core layer. The conducting unit is disposed on the core layer and electrically connected to the electronic devices. The first and second build-up circuit structures are respectively disposed on the first and the second surfaces and respectively have at least one first and at least one second openings. The piezoelectric heat dissipation units respectively correspond to the active surfaces of the electronic devices and are electrically connected to the conducting unit exposed by the first and the second openings.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIMICRON TECHNOLOGY CORPNO 179 SHANYING RD GUISHAN DIST TAOYUAN CITY 333

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Hsiang-Hung New Taipei, TW 5 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00