Method for transmitting and receiving uplink signal, user equipment, and base station

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9883502
SERIAL NO

15479482

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for receiving, by a base station, uplink signals from a user equipment, the method includes transmitting, by the base station, a physical downlink control channel (PDCCH) carrying an uplink grant for a scheduled cell, which is one of a plurality of serving cells for the user equipment, through a scheduling cell among the plurality of serving cells; and receiving, by the base station, a physical uplink shared channel (PUSCH) carrying uplink data of the user equipment through the scheduled cell according to the uplink grant, wherein the user equipment is configured with at least a primary cell (PCell) group and a secondary cell (SCell) group, wherein the PCell group is configured with a PCell and zero or more SCells among the plurality of serving cells, and the SCell group is configured with one or more SCells not belonging to the PCell group among the plurality of serving cells.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ELECTRONICS INCSEOUL SOUTH KEREAN SEOUL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Joonkui Anyang-si, KR 1270 16241
Kim, Mingyu Anyang-si, KR 171 2422
Seo, Dongyoun Anyang-si, KR 394 6962
Yang, Suckchel Anyang-si, KR 1496 15893

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00