Offload processing method, control unit, and system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9883442
SERIAL NO

14793577

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes: after a user equipment UE accesses a first-standard network, acquiring, by a control unit, first resource status information of the first-standard network and second resource status information of at least one second-standard network having an overlapping area with the first-standard network, where the first-standard network or the second-standard network includes a wireless fidelity WiFi network; and determining, by the control unit according to the first resource status information and the second resource status information, whether offload processing needs to be performed for the UE.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUAWEI TECHNOLOGIES CO LTD518129 \U3001 BANTIAN HUAWEI HEADQUARTERS OFFICE BUILDING LONGGANG DISTRICT GUANGDONG SHENZHEN SHENZHEN CITY GUANGDONG PROVINCE 518129

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dai, Yuhong Shenzhen, CN 3 6
Hu, Xiaoqun Shanghai, CN 2 11
Ji, Xiaojun Shenzhen, CN 6 13
Zhu, Haobing Shenzhen, CN 6 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00