Technologies for bridging between coarse-grained and fine-grained load balancing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9882814
SERIAL NO

14496495

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Technologies for bridging between coarse-grained and fine-grained load balancing include a computing node of a cluster computing device and a network controller. The computing node may add a flow entry to a local flow table based on flow information received from the network controller. The computing node may transmit a multicast network packet including the flow information and next hop information to other computing nodes of the cluster device. The computing node may also add a different flow entry to the local flow table and a next hop entry to a local next hop table based on a multicast network packet received from another computing node of the cluster device. The computing node may locally process a network packet received from a remote computing device or forward the received network packet to another computing node of the cluster device based on the flow entries added to the local flow table.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATION2200 MISSION COLLEGE BOULEVARD SANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gobriel, Sameh Hillsboro, US 42 548
Maciocco, Christian Portland, US 149 2470
Ramia, Kannan Babu Chandler, US 12 171
Sunder, Rajan Ashok Burnaby, CA 4 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00