Power device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9882478
SERIAL NO

14289700

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first direct-current power converter circuit increases an electrical potential difference between a positive electrical potential of a load and a positive electrical potential of a power source by a step-up operation, and a second direct-current power converter circuit increases an electrical potential difference between a negative electrical potential of the load and a negative electrical potential of the power source by a step-up operation. A control device controls switching operations of first and second switching devices included in the first direct-current power converter circuit based on a first duty. The control device controls switching operations of third and fourth switching devices included in the second direct-current power converter circuit based on a second duty. The control device controls a load voltage to be an arbitrary voltage, which is equal to or more than a source voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ohnuki, Yasumichi Utsunomiya, JP 22 246

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00