Method for producing a stator winding of an electric machine, in particular an AC generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9882458
SERIAL NO

13990811

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method for producing a stator winding (18) of an electric machine (10), in particular an AC generator, wherein the stator winding (18) has at least n phase windings (120, 121, 122, 123, 124), and one phase winding (120, 121, 122, 123, 124) has a plurality of directly successive wound coils (82) with coil sides (88) and coil side connectors (91), wherein the coils (82) are divided into first coils (82.1) and second coils (82.2), with a forming tool (100), in which slots (105, 106; 105′, 106′) are provided which are suitable for accommodating the coils (82), wherein a first coil (82.1) is arranged in a slot (105; 105′), and a second coil (82.2) is arranged in another slot (105; 105′), characterized in that n−1 slots (105, 106; 105′, 106′) are arranged between the first coil (82.1) and the second coil (82.2).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEG AUTOMOTIVE GERMANY GMBHLOTTERBERGSTRASSE 30 STUTTGART 70499

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Herbold, Klaus Asperg, DE 10 22
Kreuzer, Helmut Schwieberdingen, DE 24 222
Mueller, Alexander Stuttgart, DE 121 570
Rau, Eberhard Kortnal-Muenchingen, DE 17 153
Reutlinger, Kurt Stuttgart, DE 33 179
Schwarzkopf, Christoph Walheim, DE 8 31
Weber, Gerlinde Schwieberdingen, DE 7 16
Wolf, Gert Affalterbach, DE 28 154

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00