Switching mode charger for charging system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9882418
APP PUB NO 20150280486A1
SERIAL NO

14443654

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switching mode charger capable of performing mode switching to adjust and output charging current for a battery or driving current for an external circuit element includes an input terminal, an output terminal, a Buck-Boost converter, and a controller. The Buck-Boost converter generates a voltage at the input terminal according to a voltage at the output terminal or generates a voltage at the output terminal according to a voltage at the input terminal. The controller dynamically selects an operation mode from a plurality of operation modes as an operation mode of the Buck-Boost converter according to at least one of the voltage change and the current change that are associated with the Buck-Boost converter, wherein the Buck-Boost converter dynamically performs mode switching according to the operation mode selected by the controller so as to adjust and output the charging current or the driving current.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEDIATEK INCNO 1 DUSING RD 1ST SCIENCE-BASED INDUSTRIAL PARK HSIN-CHU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsu, Chih-Yuan Hsinchu, TW 70 799

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00