Energy distribution system and method for operating same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9882384
SERIAL NO

14764646

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an energy distribution system, energy is fed through substations into subnetworks and the distribution is monitored by a central device superordinate to the substations. At least one substation is operated in an optimization mode for optimizing the operation of the entire energy distribution grid. The substation thereby investigates a modification action which could be performed by the substation in its subnetwork for the effect of the modification action on the operating state of the entire energy distribution system. The substation receives substation-individual sensitivity values, which indicate the change in the local operating state in the subnetwork assigned to the respective other substation if the modification action were to be implemented. The substation operated in the optimization mode checks, based on the sensitivity values, whether the modification action would result in an improvement of the operating state for the entire energy distribution grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS AKTIENGESELLSCHAFTWERNER-VON-SIEMENS-STRASSE 1 MUENCHEN 80333

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dzafic, Izudin Sarajevo, BA 9 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00