Electrical busway joint with self-adjusting braces

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9882366
SERIAL NO

14990024

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A busway system is provided. The busway system includes a first electrical busway section, a second electrical busway section, and a busway joint. The first and second electrical busway sections are disposed longitudinally offset from each other. The busway joint couples the first and second busway sections. The busway joint includes a first assembly coupled to the first busway section, a second assembly coupled to the second busway section, a plurality of conductors coupled to the first and second assemblies, a first movable brace coupled to the conductors, and a first brace locator coupled to the movable brace. The first and second assemblies move relative to each other between a collapsed position and an extended position. The first movable brace moves longitudinally along a length of the conductors. The first brace locator locates the first movable brace at a first position when the first assembly is in the extended position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB SCHWEIZ AGBRUGGERSTRASSE 66 BADEN 5400

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gifford, Deniz Semih New Britain, US 5 54
Maurer, William Patrick West Hartford, US 5 54
Nguyen, Vu Dinh West Hartford, US 7 121
Olson, Anders Carl Bloomfield, US 2 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00