Optical module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9882350
SERIAL NO

14886906

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical module includes: a first thermoelectric cooler (TEC) disposed at least partially inside a laser, a second TEC is disposed on a housing of the laser, and a micro control unit (MCU). The first TEC is configured to perform heating or cooling according to an enabling signal input by a MCU. The second TEC is configured to perform heating or cooling according to an enabling signal input by the MCU. The MCU is configured to determine whether to input an enabling signal or a disabling signal to the first TEC and the second TEC according to a size of operating current input by a drive circuit of a laser chip to the laser chip.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HISENSE USA CORP7310 MCGINNIS FERRY ROAD SUWANEE GA 30024
HISENSE INTERNATIONAL CO LTDNO 218 QIANWANGANG ROAD ECONOMIC AND TECHNICAL DEVELOPMENT ZONE QINGDAO SHANDONG 266555
HISENSE BROADBRAND MULTIMEDIA TECHNOLOGIES CO LTDQINGDAO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jin, Chenghao Shandong, CN 13 44
Zhang, Qiang Shandong, CN 790 5324
Zhao, Qisheng Shandong, CN 21 140

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00