Crimp terminal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9882290
SERIAL NO

15380199

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A crimp terminal includes a terminal connecting portion, an electric wire connecting portion, and a coupling portion. The electric wire connecting portion is formed with a first barrel piece and a second barrel piece, the two facing each other, by bending processing on an electric wire side plate-shaped portion after two facing walls are formed by bending processing on a terminal side plate-shaped portion. The coupling portion is formed with two facing side walls by bending processing on a coupling side plate-shaped portion. Certain portions that will be the side walls later are formed with at least one tensile force absorbing portion that absorbs a tensile force between the terminal side plate-shaped portion side and the electric wire side plate-shaped portion side occurring during the bending processing on the terminal side plate-shaped portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAZAKI CORPORATION8-15 KONAN 1-CHOME MINATO-KU TOKYO 108-0075

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwata, Masashi Shizuoka, JP 34 243
Ohtaka, Kazuto Shizuoka, JP 81 912
Shinohara, Junya Shizuoka, JP 13 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00