Secondary battery and electronic device including secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9882179
SERIAL NO

15217407

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electronic device having a novel structure is provided. Specifically, an electronic device having a novel structure that can change its form into various appearances is provided. In a secondary battery, a foldable portion from which part of the components is removed by forming openings in a current collector becomes thin and can be more likely to be bent than the other regions. A cylindrical cushioning material overlapping with the foldable position of the secondary battery is provided. The provision of this cushioning material makes it possible to fix the minimum radius of curvature of the secondary battery at the foldable position. Accordingly, it is possible to prevent the exterior body from being broken due to bending along a curved surface with a smaller radius of curvature than a diameter of the cushioning material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR ENERGY LABORATORY CO LTDKANAGAWA KANAGAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tajima, Ryota Kanagawa, JP 163 1648

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00