Techniques for forming spin-transfer torque memory having a dot-contacted free magnetic layer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9882121
SERIAL NO

15117605

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques are disclosed for fabricating a self-aligned spin-transfer torque memory (STTM) device with a dot-contacted free magnetic layer. In some embodiments, the disclosed STTM device includes a first dielectric spacer covering sidewalls of an electrically conductive hardmask layer that is patterned to provide an electronic contact for the STTM's free magnetic layer. The hardmask contact can be narrower than the free magnetic layer. The first dielectric spacer can be utilized in patterning the STTM's fixed magnetic layer. In some embodiments, the STTM further includes an optional second dielectric spacer covering sidewalls of its free magnetic layer. The second dielectric spacer can be utilized in patterning the STTM's fixed magnetic layer and may serve, at least in part, to protect the sidewalls of the free magnetic layer from redepositing of etch byproducts during such patterning, thereby preventing electrical shorting between the fixed magnetic layer and the free magnetic layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAHOE RESEARCH LTDBLANCHARDSTOWN CORPORATE PARK 2 PLAZA 255 SUITE 2A DUBLIN D15 YH6H

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chau, Robert S Beaverton, US 516 19896
Doczy, Mark L Beaverton, US 209 6023
Doyle, Brian S Portland, US 369 14648
Kencke, David L Beaverton, US 46 928
Kuo, Charles C Hillsboro, US 91 1596
Oguz, Kaan Beaverton, US 119 979
Suri, Satyarth Hillsboro, US 34 299

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00