Solid-state imaging device and method of manufacturing the device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9881960
SERIAL NO

14556093

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Each unit pixel includes a photoelectric converter, an n-type impurity region forming an accumulation diode together with the semiconductor region, the accumulation diode accumulating a signal charge generated by the photoelectric converter, an amplifier transistor including a gate electrode electrically connected to the impurity region, and an isolation region formed around the amplifier transistor and implanted with p-type impurities. The amplifier transistor includes an n-type source/drain region formed between the gate electrode and the isolation region, and a channel region formed under the gate electrode. A gap in the isolation region is, in a gate width direction, wider at a portion including the channel region than at a portion including the source/drain region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirase, Junji Osaka, JP 77 617
Matsunaga, Yoshiyuki Kyoto, JP 129 1625
Miyagawa, Ryohei Kyoto, JP 61 947
Ohmori, Yoshiyuki Osaka, JP 8 69
Sato, Yoshihiro Osaka, JP 268 1656
Tamaki, Tokuhiko Osaka, JP 88 1193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00