Semiconductor package with three-dimensional antenna

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9881882
SERIAL NO

15335226

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor package is provided. The semiconductor package includes a package substrate having a first region and a second region defined between an edge of the package substrate and an edge of the first region. A semiconductor die is disposed on the package substrate in the first region. A three-dimensional (3D) antenna is disposed on the package substrate in the second region. The 3D antenna includes a planar structure portion and a bridge or wall structure portion. A molding compound encapsulates the semiconductor die and at least a portion of the 3D antenna. A conductive shielding element is inside the molding compound or partially covers the molding compound. A semiconductor package assembly having the semiconductor package is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEDIATEK INCNO 1 DUSING RD 1ST SCIENCE-BASED INDUSTRIAL PARK HSIN-CHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsu, Chih-Chun New Taipei, TW 11 207
Lin, Sheng-Mou Hsinchu, TW 14 217

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00