Barrier planarization for interconnect metallization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9881833
SERIAL NO

15334796

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for forming interconnect structures includes forming a barrier material over a dielectric layer having a trench, the barrier layer being disposed on sidewalls and horizontal surfaces of the trench, depositing an interconnect layer over the barrier layer to form an interconnect structure, recessing the interconnect layer down to a surface of the barrier layer using a chemical mechanical planarization process, and planarizing the barrier layer and the interconnect layer using a wet etch process to form a coplanar surface to prevent dishing or divots in the interconnect structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELPIS TECHNOLOGIES INC1891 ROBERSTON ROAD SUITE 100 OTTAWA K2H 5B7

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Briggs, Benjamin D Waterford, US 193 1272
Huang, Elbert E Carmel, US 80 1772
Nogami, Takeshi Schenectady, US 235 4443
Patlolla, Raghuveer R Guilderland, US 45 192
Peethala, Cornelius B Albany, US 16 58
Rath, David L Stormville, US 81 993

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00