Glass ceramic material and multilayer ceramic electronic component
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jan 30, 2018
Issued Date -
N/A
app pub date -
May 9, 2016
filing date -
Dec 19, 2013
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A first ceramic layer of a composite laminate included in a common mode choke coil is formed from a sintered body of a glass ceramic material. The glass ceramic material contains 40 to 90 percent by weight of a glass which contains 0.5 to 5 percent by weight of K2O, 0 to 5 percent by weight of Al2O3, 10 to 25 percent by weight of B2O3, and 70 to 85 percent by weight of SiO2; and 10 to 60 percent by weight of a filler containing alumina and quartz, and the content of the alumina contained in the filler is 1 to 10 percent by weight of the total amount of the glass and the filler.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
MURATA MANUFACTURING CO LTD | JAPAN |
International Classification(s)

- 2016 Application Filing Year
- C03C Class
- 1063 Applications Filed
- 726 Patents Issued To-Date
- 68.30 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Adachi, Hiroshige | Nagaokakyo, JP | 11 | 100 |
# of filed Patents : 11 Total Citations : 100 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- C03C Class
- 32.33 % this patent is cited more than
- 7 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jul 30, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jul 30, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
