Multi-host power controller (MHPC) of a flash-memory-based storage device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9881680
SERIAL NO

14728296

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-host power controller (MHPC) of a flash-memory-based storage device is disclosed. In one aspect, the MHPC receives power mode change requests from each of multiple input/output (I/O) clients. The MHPC extracts and stores a “vote,” or a requested power mode, from the power mode change requests, and then applies a voting logic to the stored votes to determine whether to transition the flash-memory-based storage device between power modes. If the flash-memory-based storage device is not currently operating in the power mode determined by the MHPC, the MHPC is configured to issue a power mode change command to the flash-memory-based storage device to transition to the determined power mode. In this manner, the MHPC is able to control the power mode of the flash-memory-based storage device while receiving direct power mode change requests from multiple I/O clients.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUALCOMM INCORPORATED5775 MOREHOUSE DRIVE SAN DIEGO CA 92121-1714

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shacham, Assaf Zichron Yaakov, IL 26 354
Susman, Lee Burgata, IL 4 40
Teb, David Haifa, IL 11 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00