Information processing device, power-demanding object, information processing method, and non-transitory storage medium

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9881270
SERIAL NO

15031468

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A time range setting unit (110) sets an operation startable time point at which an operation can be started and a target operation end time point which is the latest time point among time points at which the operation is to be ended, with respect to each of plural power demanding objects (20). A necessary operation time setting unit (120) sets a necessary operation time with respect to each of the plural power demanding objects (20). A shape information acquisition unit (130) acquires shape information from a schedule management device (40). The shape information indicates an assumed shape of a transition line that represents transition in the amount of supplied power in a target period. A demand transition setting unit (140) sets power demand transition information indicating transition in an electric energy demand in the target period so that the necessary operation time is obtained and so that the transition in the electric energy demand generated by the plural power demanding objects (20) being operated accords with the assumed shape.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEC CORPORATION7-1 SHIBA 5-CHOME MINATO-KU TOKYO 1088001 ?1088001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hashimoto, Ryo Tokyo, JP 52 276
Homma, Kosuke Tokyo, JP 13 96
Iwasaki, Yuma Tokyo, JP 26 63
Kudo, Koji Tokyo, JP 108 901
Sakuma, Hisato Tokyo, JP 48 268
Saneyoshi, Eisuke Tokyo, JP 37 311
Toizumi, Takahiro Tokyo, JP 65 233
Yano, Hitoshi Tokyo, JP 77 593

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00