Virtual application extension points

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9880889
SERIAL NO

14881166

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A virtual application may be configured with several extension points within a host operating system. The virtual application may be configured with a private namespace in which various components, such as registry settings, dynamic linked libraries, and other components may reside. During configuration, links may be placed in the host operating system that may point to objects in the virtual application's private namespace so that the operating system and other applications may launch, control, or otherwise interact with the virtual application. The links may be located in a file system, registry, or other locations and may be available to other applications, including other virtual applications. A configuration routine may place the links into the host operating system at the time the application may be configured.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICROSOFT TECHNOLOGY LICENSING LLCWASHINGTON STATE WASHINGTON

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Reierson, Kristofer H Acton, US 11 331
Sheehan, John M Somerville, US 51 826

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00