Modeling the effects of switching data storage resources through data storage pool tier performance capacity and demand gap analysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9880788
SERIAL NO

14934264

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The assignment of data storage resources in a data storage arrangement having a plurality of pools, where each pool includes a plurality of data storage resources arranged in tiers, can be optimized. A gap analysis can be performed for each tier of each pool to determine that tier's excess capacity or demand. The effect of switching data storage resources between tiers of different pools can be modeled to determine the effect of the switch on excess capacity and demand. An improved arrangement of data storage resources in the tiers can be determined that reduces excess capacity and demand, from the modeling of the effect of switching data storage resources between pools. At least one data storage resource can be switched from the tier of the first pool to the tier of the second pool to match the determined improved arrangement of data storage resources.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sabloniere, Pierre Paris, FR 3 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00