Stand-by power estimating apparatus and program

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9880600
SERIAL NO

14429106

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An estimating apparatus includes an acquiring unit, a history recording unit, and a determining unit. The acquiring unit acquires power amounts for respective measurement times from a measuring apparatus that measures power for each branch line, as a plurality of used power amounts. The history recording unit records the plurality of used power amounts in association with dates and times. The determining unit variably sets a comparison value for comparing magnitudes of the plurality of used power amounts recorded in the history recording unit, obtains a minimum value of the comparison value in a range satisfying a condition that an amount of time for which at least some of the plurality of used power amounts are continuously equal to or below the comparison value exceeds a prescribed sustained time, and estimates the minimum value to be a peak value of stand-by power of the branch line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTDOSAKA JAPAN OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nishiyama, Takashi Hyogo, JP 70 693
Shimizu, Noriyoshi Osaka, JP 139 1576

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00