Misrecognition determination device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9880554
SERIAL NO

15147260

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A misrecognition determination device is provided. The misrecognition determination device may be configured such that a plurality of traveling parameters that is used for driving control of a vehicle and is based on input data is calculated, a difference between each two of the plurality of traveling parameters is calculated, a weighting coefficient is calculated according to an orthogonality between each two pieces of input data in a traveling situation of the vehicle, and a determination is made whether misrecognition has occurred in a parameter group, which includes the plurality of traveling parameters, using the values each generated by multiplying the difference by the weighting coefficient.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuriyama, Tomoyuki Hadano, JP 90 578
Taguchi, Koji Isehara, JP 91 1478
Yamaoka, Masaaki Susono, JP 39 701
Yokoyama, Akihisa Susono, JP 28 808

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00