Light guide plate, light source device, light guide plate manufacturing apparatus, and method for manufacturing light guide plate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9880340
SERIAL NO

14417380

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A light guide plate according to the present invention includes a light guide member having a first and second main surfaces and a diffusing member next to at least one of the first and second main surfaces of the light guide member. A plurality of recesses are formed in one of the two main surfaces of the diffusing member that is opposite to the main surface next to the light guide member to diffuse light incident to the light guide member at the recesses. The recesses may include a first recess and a second recess. Preferably, when viewing the first main surface of the light guide member in a normal direction, a distance between a light incident surface and the second recess is greater than that between the light incident surface and the first recess, and the second recess is larger than the first recess.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAKAMOTO JUNOSAKA JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sakamoto, Koji Osaka, JP 126 1277

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00