Estimating coolant conductivity in a multi-voltage fuel cell system without disconnecting contactors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9880226
SERIAL NO

14882247

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for monitoring the conductivity of a cooling fluid flowing in a fuel cell system on a vehicle including a chassis. The fuel cell system includes a fuel cell stack electrically coupled to a stack bus and a battery electrically coupled to a propulsion bus. The method includes operating the fuel cell system, measuring a first isolation resistance at the first power level, measuring a first stack voltage, and measuring a first battery voltage. The method also includes operating the fuel cell system at a second power level, and measuring a second isolation resistance, measuring a second stack voltage, and measuring a second battery voltage. The method calculates a stack coolant resistance using the first and second isolation resistances, the first and second stack voltages, and the first and second battery voltages, which is then used to calculate the cooling fluid conductivity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 MAIL CODE 482-C23-B21 DETROIT MI 48265-3000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Foley, Robert S Rochester, US 17 83

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00