Gas turbine engine afterburner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9879862
SERIAL NO

14196857

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An afterburner is disclosed for use with a gas turbine engine and, in one form, is structured to receive a bypass air. The afterburner can be situated in a bypass duct and can be a toroidal combustor or a can combustor. In one embodiment, the afterburner includes a combustor arranged to receive bypass air and a plurality of vanes distributed downstream of a turbine of the gas turbine engine. The vanes can include one or more exit apertures through which hot combustion flow from the afterburner combustor can be injected. The exit apertures can be protrusions or slots in some forms. In one embodiment, a cooling passage is arranged around the exit apertures. An upstream vane portion can be positioned to inject fuel to be combusted via interaction with hot flow that is discharged through the exit apertures.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROLLS-ROYCE NORTH AMERICAN TECHNOLOGIES INC2059 S TIBBS AVE INDIANAPOLIS IN 46241

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McCormick, Keith A Indianapolis, US 2 8
Roesler, Timothy C Plainfield, US 8 70
Verdouw, Albert J Indianapolis, US 7 124

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00