removal unit
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jan 30, 2018
Issued Date -
N/A
app pub date -
Jul 31, 2015
filing date -
Aug 21, 2014
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
The combustion and flue gas treatment system includes a furnace for combusting a fuel with an oxidizer generating a flue gas, ducting for the flue gas connected to a NOx removal unit and a SOx removal unit, and a recirculation line for recirculating a part of the flue gas back to the furnace. The SOx removal unit is located upstream of the NOx removal unit with reference to the flue gas flow. The recirculation line is connected to the ducting downstream the SOx removal unit.
First Claim
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
ALSTOM TECHNOLOGY LTD | 5400 BADEN |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Böös, Erik W | Vederslöv, SE | 4 | 7 |
# of filed Patents : 4 Total Citations : 7 | |||
Stallmann, Olaf | Essenheim, DE | 41 | 133 |
# of filed Patents : 41 Total Citations : 133 | |||
Wang, Wuyin | Växjö, SE | 12 | 38 |
# of filed Patents : 12 Total Citations : 38 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- F23J Class
- 0 % this patent is cited more than
- 7 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jul 30, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jul 30, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Legal Events

Matter Detail

Renewals Detail
