High-pressure tank and manufacturing method of high-pressure tank

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9879825
SERIAL NO

13701856

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high-pressure tank configured to store a fluid includes: a liner; and a fiber-reinforced resin layer configured to cover surface of the liner. The liner includes: a cylindrical liner portion in a cylindrical shape; and dome liner portions in a dome shape, each dome liner portion being connected with the cylindrical liner portion, such that an outer surface of the dome liner portion is inclined at a predetermined angle to an outer surface of the cylindrical liner portion. The fiber-reinforced resin layer includes a hoop layer provided by hoop winding that winds the fiber substantially perpendicularly to a central axis of the cylindrical liner portion. The hoop layer is formed, such that an outer surface of the hoop layer has a smaller angle than the predetermined angle to the outer surface of the dome liner portion at a boundary between the hoop layer and the dome liner portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kaneko, Tomonori Toyota, JP 39 153
Otsubo, Hirokazu Toyota, JP 17 154

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00