Rod guide system and method with multiple solenoid valve cartridges and multiple pressure regulated valve assemblies

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9879746
SERIAL NO

14738332

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a shock absorber having a pressure tube forming a pressure chamber. A piston rod is disposed within the pressure chamber. A reserve tube defines a reserve chamber adjacent the pressure tube. A rod guide assembly is concentrically disposed about the piston rod and the pressure chamber and houses a plurality of digital valves. Each one of the digital valves includes a component which is moveable between an open state and a closed state, and thus helps to control a fluid flow between the pressure chamber and the reserve chamber. An electronic control system is disposed on a printed circuit board assembly (PCBA) and controls actuation of the digital valves. At least one additional valve is associated with one of the digital valves for further controlling a flow of fluid between the pressure chamber and the reserve chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TENNECO AUTOMOTIVE OPERATING COMPANY INC500 NORTH FIELD DRIVE LAKE FOREST IL 60045

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Keil, Daniel T Temperance, US 11 251
Roessle, Matthew L Temperance, US 25 410

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00