Fuel injector with variable area pintle nozzle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9879644
APP PUB NO 20110240770A1
SERIAL NO

12752274

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel injector may include a housing, a pintle nozzle assembly and an actuation assembly. The housing may define a longitudinal bore, a high pressure fuel duct in communication with the longitudinal bore and a valve seat including a valve seat surface and an aperture. The pintle nozzle assembly may include a stem and a pintle and may be at least partially disposed within the longitudinal bore and be variably displaceable between a first position and a second position. In the first position, the pintle nozzle assembly may abut the valve seat to seal the aperture. In the second position, the pintle nozzle assembly may be displaced from the valve seat to open the aperture. The actuation assembly may be coupled with the pintle nozzle assembly and operate to move the pintle nozzle assembly to a plurality of positions between the first position and the second position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 MAIL CODE 482-C23-B21 DETROIT MI 48265-3000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Straub, Robert D Lowell, US 39 525

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00