Systems and methods for double data rate communication via power cable

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9879527
SERIAL NO

14481328

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for communicating messages over a three-phase power cable between surface equipment and downhole equipment in a well. A transmitter parses messages into data bit pairs and generates a parity bit for each pair (a triplet). The bits of each triplet are concurrently but separately transmitted over the power cable. Each triplet is received from the power cable by a receiver and is decoded to identify the data bits. The receiver may verify the received bits and/or recover a lost bit in each triplet. The data bits are then reconstructed into the original message. Since each triplet has two bits, the effective data rate is twice the data rate of transmitting a single bit at a time. The parity bit enables recovery of data with a bit error rate of up to 1 in 3.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAKER HUGHES INCORPORATED2929 ALLEN PARKWAY SUITE 2100 HOUSTON TX 77019-2118

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chronister, Vernon Tulsa, US 3 7
Coulston, Stephen J Houston, US 2 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00