Methods of obtaining a hydrocarbon material contained within a subterranean formation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9879511
APP PUB NO 20150144343A1
SERIAL NO

14088331

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of obtaining a hydrocarbon material from a subterranean formation comprises forming a flooding suspension comprising degradable particles and a carrier fluid. The flooding suspension is introduced into a subterranean formation containing a hydrocarbon material to form an emulsion stabilized by the degradable particles and remove the emulsion from the subterranean formation. At least a portion of the degradable particles are degraded to destabilize the emulsion. An additional method of obtaining a hydrocarbon material from a subterranean formation, and a stabilized emulsion are also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAKER HUGHES INCORPORATED2929 ALLEN PARKWAY SUITE 2100 HOUSTON TX 77019-2118

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Agrawal, Gaurav Aurora, US 164 2913
Johnson, Michael H Spring, US 174 5012
Khabashesku, Valery N Houston, US 93 702
Kuznetsov, Oleksandr V Houston, US 29 184
Mazyar, Oleg A Houston, US 77 1416

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00